Row | Contract Subject | The Employer | Contract Period |
---|---|---|---|
1 | Installation of MV and HV panels of the middle sponge steel factory construction project including construction of chassis, support chassis, control frames, preparation of panels, complete installation of connectors | Iran National Steel Company | 2 solar months |
2 | Completion and cabling of instrumentation and automation equipment related to Core AREA, Raw Material Handling areas | Khatam al-Nabiya construction camp | |
3 | Providing engineering services to review and study JUNCTION Box and LCB placement maps on the site Studying P&ID maps, Wiring, Data Books of compressor units | Khatam al-Nabiya construction camp | 4 solar months |
4 | Equipment cabling operation and precision instruments and tray automation for related works - middle steel project | Khatam al-Nabiya construction camp | 3 solar months |
5 | Implementation of the tray installation operation, Work endowment, precision equipment cabling and automation | Khatam al-Nabiya construction camp | |
6 | Preparation and installation of PCS7 V8.1 software | Ahya Steel Texture Co | 20 days |
7 | Implementation of the automation system Machine control and monitoring | Grain and trading services company | 3 solar months |
8 | Installation of electrical appliances and equipment, implementation of cabling, assembly and installation of local control boxes | Grain and trading services company | 20 days |
9 | Purchase of electrical appliances and equipment, implementation of cabling, assembling and installation of local control boxes | Grain and trading services company | 20 days |
10 | Installation and commissioning of silo automation and monitoring system in Islamabad West | Kermanshah Grain and trading services company | 12 months |
11 | Purchase of installation parts for silo automation and monitoring system in Islamabad West | Kermanshah Grain and trading services company | 12 months |
12 | Purchase and delivery of automation boards PLC1, PLC2, PLC3 | Iran State Trading Company | 2 solar months |
13 | Design, supply, optimization Valipur silo dust absorption system | Grain and Commercial Services Company, Region 8 | |
14 | Purchase of necessary parts for plc automation monitoring of the newly constructed 50 thousand ton silo in Bijar | Grain and Trading Company | 2 solar months |
15 | Purchase of necessary parts, including belt deflection sensors, programming and monitoring on the 50,000-ton silo elevators of Bijar | Iran State Trading Company | 2 solar months |
16 | Conduit work and sazbanding and installation and operation of belt deviation sensors, operation of chain conveyors(cc11-cc10) | State Trading Company of Iran Region 8 | 2 solar months |
17 | Designing all plans, electrical system documents Automation control of the project of construction of grain storage silos located at the dock | Pasargad Noor Esia Co | 2 solar months |
18 | supply, optimization and installation and Setting up industrial automation and monitoring computers in Karimabad silvi | Grain and Commercial Services Company, Region 8 | 3 solar months |
19 | The sale of French STIF smart sensors related to the belt deviation sensors of Semnan's triple silo concrete silos. | Grain and commercial services company, region 2 | 3 solar months |
20 | Supplying cables and optical fiber cabling of Middle Foulad Complex | Mianeh Steel Complex | 3 solar months |
21 | Buying and installing an industrial computer related to the industrial automation system Neka silage equipment and machinery | Grain and commercial services company, region 2 | 10 days |
22 | Design and manufacture of explosion-proof valves of silo elevators one and two in Tabriz (Mianeh-Ahar) | General Department of Grain and Commercial Services of East Azarbaijan Province | 70 days |
23 | Design, supply, construction, installation and commissioning of electrical panels of motor control centers, silage machines of Shahid Mirzapur Neka | General Department of Grain and Commercial Services of Mazandaran Province | 3 solar months |
24 | No-load and no-load tests of machines and equipment according to IEC standards | General Department of Grain and Commercial Services of Razavi Khorasan Province | 1 solar months |
25 | Design, manufacture, supply, installation and operation of electrical control panels for 20,000-ton Saveh silage | Jihad Tous Research Company | 2 solar months |
26 | Design, purchase, supply, transportation, installation and administration of upper gallery filtration system | General Department of Grain and Commercial Services of Lorestan Province | 3 solar months |
27 | Design, purchase, supply, transportation, installation and administration of Birjand Silo filtration system | General Department of Grain and Commercial Services of Razavi Khorasan Province | 3 solar months |
28 | Design and implementation of electrical and control system development and control system integration plan Monitoring of the 50,000-ton metal silo project in Bandar Nowshahr | Pasargad Noor Esia Co | 2 solar months |
29 | Purchase, transportation, installation and commissioning of filtration system equipment for concrete silos in Gorgan, Zanjan, Arak | Iran's state-owned specialized trading mother company | 6 solar months |
30 | Purchase, transportation, installation and commissioning of filtration system equipment for concrete silos in Azna, Yazd, Andimeshk | Iran's state-owned specialized trading mother company | 6 solar months |
31 | 120,000 ton silage automation, control and monitoring system in Akbarabad, Shiraz | Iran's state-owned specialized trading mother company | 3 solar months |
32 | Purchase, procurement, transportation, installation and commissioning of earthing system and lightning arrester of Bukan mechanized warehouse | General Department of Grain and Commercial Services of West Azarbaijan Province | |
33 | Purchase, installation of compressed air compressor, installation and commissioning of Behbahan Silvi Jet Filtera | General Department of Grain and Commercial Services of Khuzestan Province | 2 solar months |
34 | Installation and operation of inductive sensor in Akbarabad silo, Shiraz | General Department of Grain and Farming Services of Fars Province | 10 days |
35 | Purchase, transportation, installation of the lighting system of the security area and the lower glazing of the 70,000 ton Bukan mechanized warehouse. | General Department of Grain and Commercial Services of Khuzestan Province | 2 solar months |
36 | Purchase, transportation, installation and commissioning of seven 400 kVA diesel generators in permanent working mode | Iran's state-owned specialized trading mother company | 9 solar months |
37 | Purchase, installation, commissioning, modification and completion of ventilators The old silage filtration system of Azna city | General Department of Grain and Commercial Services of Lorestan Province | 2 solar months |
38 | Maintenance, unloading, loading and management of centers Storage facilities of West Azarbaijan province | Iran's state-owned specialized trading mother company | 12 solar months |
39 | Preparation and implementation of diesel generator (with canopy) for emergency lighting in Kohsar Park | Mashhad municipality | 3 solar months |